Friday, July 8, 2011

FAQs about the Proposed New Power Lines through the White Mountain National Forest (Part 1)

Northern Pass's Special Use Permit application to construct two new power lines through the White Mountain National Forest  (WMNF)  does not contain FAQs. Here are questions that some people are asking. This is Part 1 in a series.


Does Northern Pass hold a right of way (ROW) or easement rights from the USFS to cross the WMNF?
  • No, the USFS does not deed permanent ROW easements on the WMNF.
How are they going to build there?
  • For six miles of the ten-mile corridor through the WMNF, Northern Pass is applying for a Special Use Permit, which is renewable but not permanent. SUPs usually are granted for 30 years.
  • For the remaining four miles, Northern Pass proposes to use PSNH's private easement that had already been granted when WMNF acquired the land.
Can Northern Pass use PSNH's private easement?
  • That's a good question.
  • The 1951 easement deed restricts rights to "the grantee [PSNH], its successors, and assigns," legal terms.
  • Northern Pass is not PSNH's legal successor or assign.
  • Stay tuned.
Would Northern Pass have to get permissions of any kind from USFS to build on the WMNF land where PSNH holds a private easement?
  • Northern Pass says no. It has excluded the four miles of private easement from its application.
  • More on this in a subsequent part of this series.
How many power lines does Northern Pass want to build in the WMNF?
  • Two, a new AC line and new DC line.
How would they fit two power lines where there is currently only one?
  • The old AC line in the center of the 150' corridor would be dug up and removed.
  • The new AC line would be installed on one edge of the corridor.
  • The new DC line would be constructed on the other edge of the corridor.
What would they do with the current wooden AC poles, which are coated with creosote, an EPA-registered pesticide?
  • The current creosoted AC poles would be dug up, disassembled, and removed from the corridor.
  • After removal from the corridor, the poles would be recycled, buried in a landfill, or burned in a commercial or industrial incinerator or boiler.
How many towers does Northern Pass want to construct in the WMNF?
  • Northern Pass proposes to construct 79 towers for the new AC line.
  • It also proposes to construct 79 towers for the new DC line.   
  • The total would be158 new towers.
How far apart would the towers be?
  • 660'.
How tall would the new towers be?
  • The AC towers would be approximately 65'-110'.
  • The DC towers would be approximately 100'-135'.
How much taller would the new towers be than the current poles?
  • The typical height of the current poles is 52'.
  • The tallest new structures will be 2x to 2.75x higher than the current poles.
What does a power line corrdior with co-located AC and DC towers look like?

National Grid, Rte. 25C, Warren NH

Has Northern Pass published one of those "visual simulations" for what its two lines of towers will look like in the WMNF?
  • No
(To be continued.)

Thursday, July 7, 2011

The NH Land Grab Map

Currently, property owners in 21 towns in New Hampshire would face eminent domain seizure of their land if they do not give Northern Pass what it wants for 66 miles of proposed new right-of-ways. The following map was created by Neil Irvine based on Northern Pass data. View and download a larger format version here. Permission granted for use.


                                                      

North to south, towns currently facing eminent domain seizures are: Pittsburg, Clarksville, Stewartstown, Colebrook, Columbia, Stratford, Northumberland, Bethlehem, Woodstock, Campton, Bridgewater, New Hampton, Hill, Franklin, Northfield, Canterbury, Concord, Chichester, Pembroke, Allenstown, Deerfield.

Tuesday, July 5, 2011

Muntz Abridged but Perfectly in Order: A Found Poem

Guest blogger Kris Pastoriza (Easton) has composed a "found poem" based upon James Muntz's recently submitted Special Use Permit application to the USFS. A found poem uses pre-existing texts verbatim and rearranges them to find new meanings. Kris's poem abridges Muntz's text, but follows its order exactly from beginning to end. 
                                                      


         Approximately 93 Conditionals on the Corridor or Muntz Abridged
                                                                          
by
Kris Pastoriza

                                                                 


      “An estimated $25 million a year...can be used...to help...
         Approximately ...as estimated... can be...will help...stimulate... attractive..


        Northern Pass has attempted...to minimize... as much as practicable...
        and seeks to achieve this,
        in part...
      
        minimize...disturbance.. Within...
       
        Northern Pass anticipates being able to locate...approximately...
       
        ...nothing about this design or proposed Use should be viewed as final...
       
        Northern Pass anticipates...
        robust...
        in earnest...
        we provide...
      
        Northern Pass is seeking to the extent possible to locate...
        could be...
        Depending on the amount...
        may, however eliminate the need...
        could also reduce...may reduce...
        would require approximately
        79 steel structures that could
        range from approximately
        100-135 feet in height... Based on the preliminary engineering.

       To the extent possible...minimize impacts...
       appears to be a typographical error...

       approximately 30,085 feet in length...
       approximately 21,823 feet in length...
       approximately... based on the preliminary design...to the extent feasible...could
       include...
       to minimize...
    
       essentially clear...
       as necessary...minimize...to the extent possible...
       Where practical...to minimize...
       care would be
       taken...to the extent possible...
       could possibly...

       Northern Pass requests a permit area for the life of the transmission line and
       thus requests a permit area for the maximum duration available under Forest
       Service regulations.

       Approximately...approximately...seek to minimize...
       number and location... have yet to be determined...
       will likely consist of...
       minimize...
       may be located within... can vary in size...could range between
       5,000 and 14,000 square feet..  depending... ultimately depend on... as much
       as possible...will update...

       Northern Pass has...seriously considered...reducing or minimizing impacts to
       the extent practicable
       minimize impacts to the extent practicable...where possible...
       minimize...minimizing...minimize...
       can, as appropriate, be incorporated...
       maximizing...to the greatest extent practicable...
       may require...would likely involve..

       Northern Pass has endeavored to minimize...while balancing...to the extent
       practicable...             
       minimizes.. minimizing.. can be...
       help...
       estimates...will help...

       Northern Pass... develop an approach that minimizes... to the extent
       practicable...
       will  help reduce...not expected to have any impacts..
       minimize potential impacts...efforts will be taken...minimize... impacts...
       will be temporary.
       Permanent impacts will be avoided, minimized and mitigated.

        
       Could consist of...sounds...will be temporary in nature...
       expected to occur... some impacts... some additional clearing and grading...
                        45.5 acres of wetlands...avoid and minimize impacts to wetlands
                        wherever possible...
                        avoid or minimize impacts to wetlands...
                        Most impacts to wetland...will be temporary...
                        will revegetate..

        Northern Pass will minimize and mitigate permanent impacts where avoidance
        is not possible...
        anticipated...

       The Proposed Use is not anticipated to have any probable effects...
       depending on final design...



National Grid HV lines on Rt. 25C near the Appalachian Trail